Everything we cover, for homes across Galway, Mayo, Roscommon, Sligo and Leitrim. Emptying is the routine job; upgrades, replacement and percolation testing are where the decisions and the grant money actually are.
De-sludging by a permitted waste collector, with the pump chamber done at the same time and a receipt you can keep. The EPA changed how often it needs doing — most Irish advice has not caught up.
Learn more →Failed an inspection, or holding an advisory notice? Remediation is scoped to the actual risk, not to modern standards — and a grant may cover most of it.
Learn more →New systems, secondary treatment and soil polishing filters, built to the EPA 2021 Code of Practice — including the options that work on slow western ground.
Learn more →Trial hole, percolation tests and a site characterisation report for planning. What the numbers mean, and what your options are if the ground drains too slowly.
Learn more →Send us the details and describe what you are seeing — which county, what the symptom is, and roughly how old the system is. If you are just trying to work out whether the tank is even due, the de-sludging calculator runs the EPA’s own table and tells you the interval for your household.
Facing something bigger than a service call? Replacement and new systems has its own page — what the ground has to allow, and what the 2021 Code changed for slow-draining sites.
Fill out the form and our team will get back to you within 24 hours. Emergency? Call us directly.
Call Us Now
info@westofirelandseptic.com
Email Us
info@westofirelandseptic.com